Buffer Yard:
|
15 ft total adjacent (Level B) to DD1, DD2, DD3, and DD4
10 ft total adjacent to DD5, DD6, DD7, AD1, AD2, AD3, AD4, and Greenway (160.488)
|
Buffer Reduction:
|
5 ft reduction when parking adjacent (for Level B buffer yards) (160.488)
|
Signage:
|
50 sq ft for wall signage allowed and 50 sq ft of freestanding, not to exceed 6 ft in height (160.570 et al.)
|
Parking:
|
1 parking space for each employee or volunteer on the max shift plus 1 space for each bedroom (160.550et al.)
|
Landscaping: |
90% of all required yard setbacks and buffer yards (160.485 et al.)
|
Parking Lot Landscaping:
|
1 tree per 18 parking spaces (160.485)
|
Parking Lot Design:
|
8.5 ft minimum stall width; 7.5 ft for compact cars
Parking lot layout and dimensions approved per Engineering Design Standards
Parking lots shall generally be hard surfaced
Divide parking lots with more than 200 spaces
Provide a direct and clearly defined pedestrian pathway from adjacent public sidewalk to building entrance (160.556)
|
Service Functions:
|
Screened or hidden from view (160.485)
|
Fence:
|
No more than 8 ft in height except in front yard (160.480 et al.)
|
Lighting:
|
Within 150 ft of residential areas, lights shall be no more than 28 ft high (160.491)
|
Alternative Site Plans:
|
Allowed for buffer yard reduction, landscaping alternatives, and parking reduction (160.594 et al.)
|