Wastewater System Capacity Charge
The Wastewater System Capacity Charge (SCC) helps fund expansion of the city's wastewater infrastructure necessitated by development through a one-time fee when a new water meter is bought from the City of Sioux Falls. This charge is based on the size of a property’s water meter and is designed as a “pay for what you use” model.
This fee is not charged to existing homeowners or other utility customers unless a larger water meter needs to be installed at the property. The Wastewater System Capacity Charge is not an ongoing utility rate or tax to be paid each year, nor is it included in the monthly utility bill.
What Developers, Home Builders, and Plumbers Need to Know
The previous fee model, a Cost Recovery Fee (CRF), was collected at platting, early in the development process. The Wastewater SCC will eventually replace the CRF model and is collected during the purchase of a water meter from the City of Sioux Falls. This is typically one of the last steps before occupancy, when the nature of the development is determined. In most cases, the SCC will be paid for by the developer, builder, or plumber.
Redevelopment
If a property is redeveloped and requires a larger water meter, the Wastewater SCC will be collected. The customer receives credit for the previous water meter(s) and pays the difference.
Transition Plan
During a 10-year period between 2025 and 2035, the City of Sioux Falls will follow a transition plan as it switches models:
Cost Estimates
Public Works has calculated the average impact for seven typical water meter sizes. Please note that these fees are estimated and the assessed Wastewater SCC may differ depending on whether a property is located within an existing cost-recovery fee area.
See cost estimate charts